Omobonus Serwis – computer, laptop and printer repair Wrocław
Omobonusserwis
Omobonus serwis

Service and repair of UPS power supplies in Wrocław

(APC, Schneider Electric, Eaton, Powerware, Riello, Vertiv, Liebert, Emerson, MGE, Socomec, Delta, Ever, Fideltronik, CyberPower, PowerWalker, Legrand, AEG, ABB, GE, Siemens, G-Tec, Borri, Orvaldi, Salicru…)
apc
schneider-electric
eaton
powerware
riello
vertiv
liebert
emerson
mge
socomec
delta
ever
fideltronik
cyberpower
powerwalker
legrand
aeg
abb
ge
siemens
g-tec
borri
orvaldi
salicru
Online initial diagnosis
(describe the problem via WhatsApp, our website or by phone)
FREE
up to 15 min
Initial diagnosis when you bring the device to our service centre, 15 min
(also if you decide not to go ahead with the repair)
FREE
up to 15 min
Diagnosis and repair quote
(if the repair goes ahead)
FREE
1–3 days
Diagnosis and repair quote
(if you decide not to go ahead with the repair)
60/100/180
1–3 days
Written technical report
(in addition to the full diagnosis, with photo documentation)
+ 50 zł
1–3 days
Urgent service
(where possible, we speed up the repair at no extra charge)
FREE
to be agreed
“FREE CALL-OUT” 🤔
We don’t claim that the call-out or pickup is “free” and then add that cost to the repair price
Pickup of the device from the customer
(up to 2.5 km from our service centre; 5 km in total, both ways)
25 zł
1–2 days
Delivery of the repaired device to the customer
(up to 2.5 km from our service centre; 5 km in total, both ways)
25 zł
1–2 days
Pickup or delivery beyond 2.5 km from our service centre
(round trip; extra charge after the first 5 km)
25 zł
+ 2 zł/km
1–2 days
Urgent service
(where possible, we handle your pickup or delivery first)
FREE
to be agreed
Courier shipping from anywhere in Poland
(you can send your UPS to our service centre by courier, and after the repair we will send it back the same way)
carrier's
rates
1–2 days
“JUST A BLOW-OUT?” 🤔
We don’t stop at removing dust — we carry out a full inspection and maintenance of the UPS
CLEANING AND MAINTENANCE [[comprehensive ]]cleaning, inspection and testing of the device
• cleaning the inside of the UPS, the fans and the cooling system;
• checking electrical connections and cable terminals;
• checking the electronics, capacitors and fans;
• checking the batteries and measuring internal resistance;
• measuring input and output parameters;
• checking messages, alarms and error history;
• testing normal, battery and bypass operation;
• final operation test and service recommendations.
150/250/450
1–2 days
Battery test / resistance measurement
(the UPS provides backup only briefly, reports a weak battery or discharges quickly)
50/80/150
up to 1 day
Battery replacement + calibration
(the UPS does not provide backup power, the battery is worn out or needs replacing)
60/120/220
+ parts
up to 1 day
Repair of battery cables / connections
(the UPS does not detect the battery, stops working on battery or reports a battery error)
80/120/220
+ parts
1–2 days
Backup time test
(checking how long the UPS actually runs after a power cut)
50/80/150
up to 1 day
Charging circuit repair
(the UPS does not charge the batteries, charges them too slowly or reports a charging error)
180/300/500
+ parts
1–3 days
Rectifier / PFC circuit repair
(the UPS does not start from the mains, reports a power error or does not charge the battery)
200/350/600
+ parts
1–3 days
Auxiliary converter repair
(the UPS does not start, keeps resetting or part of the electronics does not work)
180/300/500
+ parts
1–3 days
DC capacitor replacement
(the UPS works unstably, switches off or power section errors appear)
120/220/400
+ parts
1–3 days
Inverter repair
(the UPS does not output voltage, switches off under load or goes into an error state)
200/350/650
+ parts
1–3 days
Power transistor replacement (MOSFET / IGBT)
(the UPS does not enable its output, trips the protection or reports a power error)
220/400/700
+ parts
1–3 days
Power section repair
(the UPS does not power connected devices, switches off or works unstably under load)
200/350/650
+ parts
1–3 days
AC capacitor replacement
(the UPS works unstably, is noisy or there are problems with the output voltage)
120/220/400
+ parts
1–3 days
Repair after a power surge / storm
(the UPS stopped working after a storm, voltage spike or mains failure, there is a burning smell or it trips the protection)
250/450/800
+ parts
1–3 days
Static Bypass circuit repair
(the UPS does not switch to bypass or reports an error while switching)
—/350/600
+ parts
1–3 days
Bypass relay repair / replacement
(the UPS does not switch power, stops working or you can hear abnormal switching)
100/180/320
+ parts
1–2 days
Mains / battery switching circuit repair
(the UPS does not switch to battery or does not return to mains power)
150/280/500
+ parts
1–3 days
Control board / main board repair
(the UPS does not start, freezes, keeps resetting or reports control errors)
180/300/550
+ parts
1–3 days
Repair of control, measurement and protection circuits
(incorrect readings, false alarms or protection not working properly)
150/280/500
+ parts
1–3 days
Control panel / display repair
(the display does not work, the buttons do not respond or you cannot control the UPS)
100/180/300
+ parts
1–2 days
Power board repair
(the UPS does not switch on, keeps resetting or does not power some of its circuits)
180/300/500
+ parts
1–3 days
UPS firmware update / restore
(firmware error, the UPS does not start after a failed update or needs a newer version — if the manufacturer provides one)
50/80/120
up to 1 day
Fan replacement (one or more)
(the fan is noisy, does not turn or the UPS overheats)
70/120/220
+ parts
up to 1 day
Cooling control repair
(the fans run all the time, do not start or the UPS reports a temperature warning)
100/180/320
+ parts
1–2 days
SNMP network card repair / replacement
(no UPS monitoring, the card does not respond or the device drops off the network)
—/180/280
+ parts
1–2 days
Communication interface repair
(no communication via USB, RS232 or the network)
100/150/250
+ parts
1–2 days
UPS communication setup
(the UPS works but does not communicate properly with the computer, server or monitoring system)
60/100/150
up to 1 day
We service brands including APC, Schneider Electric, Eaton, Powerware, Riello, Vertiv, Liebert, Emerson, MGE, Socomec, Delta, Ever, Fideltronik, CyberPower, PowerWalker, Legrand, AEG, ABB, GE, Siemens, G-Tec, Borri, Orvaldi, Salicru, Tripp Lite, Huawei, Mustek, Inform, Gamatronic, Chloride, Masterguard, Schrack, Cover, Aros and CES. If your brand is not on the list, tell us the manufacturer and the exact UPS model.
We service Online / Double Conversion, Line-Interactive and Offline / Standby UPS units — from small UPSs for computers and office equipment, through professional UPSs for server rooms, including 19” rack units, to larger industrial systems. We repair both single-phase and three-phase UPSs. We accept large and three-phase UPSs at our service centre and repair them there, without visiting the customer. UPSs above 10 kVA are quoted individually.
The cause may be, among other things, damaged batteries, power supply circuit, rectifier, converter, inverter, power section or control electronics. We identify the exact cause during the diagnosis.
Not always. The most common cause is worn-out batteries, but the problem may also lie in the charging circuit, battery connections, inverter or the UPS electronics.
The cause may be an overload, a problem with the inverter, the supply parameters, the control electronics or the bypass circuit itself. We establish the exact cause after the diagnosis.
Most often it means the batteries are worn out, but the signal may also indicate an overload, battery operation, overheating or a fault in the charging circuit. We establish the exact cause during the diagnosis.
Typical symptoms are a short backup time, a sudden shutdown after a power cut, a weak battery message or a problem switching to battery operation.
We can assess the batteries by, among other things, measuring their parameters and internal resistance and running suitable operation tests on the device.
Usually 3–5 years, depending on the quality of the batteries and the operating conditions. High temperature shortens their life the most — a UPS works best in a cool room (around 20–25°C), away from radiators and with its ventilation openings uncovered.
In systems made up of several or a dozen or more batteries, replacing the whole set is often recommended. The final decision depends on the age, condition and measurement results of the individual batteries.
Yes, as long as they have the voltage, capacity, technology, dimensions and operating parameters required by the UPS in question.
If the model requires calibration, a battery information reset or additional tests after the replacement, we carry out the necessary steps as part of the replacement service.
We repair, among other things, battery charging circuits, main boards and control electronics, measurement and protection circuits, displays and control panels, fans, AC and DC capacitors, as well as SNMP, USB and RS232 communication. We determine the scope of the repair after the diagnosis.
Yes. Depending on the design of the device, we repair inverters, rectifiers, PFC circuits and converters, replace MOSFET / IGBT power transistors, and repair Static Bypass circuits, relays and the components responsible for switching between mains, battery and bypass power.
We complete most repairs within 1–3 days of the quote being accepted. If we need parts that we do not have in stock, the repair may take longer — we let you know when we give you the quote. In urgent cases, where possible, we speed up the repair at no extra charge.
The price depends on the type of fault and the power rating of the UPS — the price list shows separate prices for UPSs up to 1 kVA, 1–3 kVA and 3–10 kVA. You will get the exact repair cost after the diagnosis, before any work starts. UPSs above 10 kVA are quoted individually.
The diagnosis is free if you decide to go ahead with the repair after receiving the quote. If you decide not to repair, we charge a diagnosis fee according to the price list — depending on the power rating of the UPS.
Yes. First we diagnose the device and give you the scope and cost of the repair. We carry out the repair once you have accepted the quote.
Yes. After the repair, we run tests appropriate to the work carried out. If a load test or calibration is needed to complete the repair properly, it is part of the repair and we do not charge for it again as a separate service.
We give a 6-month warranty on the repair carried out, and 12 months on new batteries fitted at our service centre.
If the same fault comes back during the warranty period, we diagnose and repair the device again free of charge.
In typical conditions, it is worth having an inspection at least once a year. With heavy use, high temperature, dust or critical infrastructure, inspections may be needed more often.
It may include cleaning the inside of the device, checking the connections, electronics, capacitors and fans, checking the batteries, measuring parameters, analysing errors and testing mains, battery and bypass operation.
Yes, we issue VAT invoices. For businesses, we also offer regular periodic UPS inspections and ongoing service support — we agree the scope and schedule individually. We carry out inspections and repairs at our service centre.
Yes, you can send a UPS to our service centre by courier from anywhere in Poland. Before sending it, switch the UPS off and disconnect it from the power supply, pack it in a sturdy box (ideally the original one) and secure it with filling so that it cannot move inside — the batteries make a UPS heavy. For large or heavy devices (e.g. rack units or units with battery modules), please contact us before sending. You can also bring the UPS to our service centre in person or order pickup and delivery according to the price list (the “Pickup and delivery” section).
It depends on the type of damage, the condition of the device, the availability of parts and the repair cost. After the diagnosis, we can assess whether the repair makes economic sense compared with replacing the device.

Battery replacement, diagnostics, repair of the electronics and charging circuit of UPS power supplies.

Your UPS — we will tell you the repair cost within 15 min.

UPS units for home, office and server room: APC, Eaton, Ever, Vertiv and others.

gg
gg
⭐⭐⭐⭐⭐
• a week ago

Found the company online — complete professionalism and good communication right from the start👍 My Epson printer was serviced practically on the spot — full trust — invoice after the job, paid by bank transfer😀 Recommended👌👍

Aleksandra Świderska
Aleksandra Świderska
⭐⭐⭐⭐⭐
• 2 weeks ago

I have used this computer repair service several times and can recommend it wholeheartedly. Only here did they solve the problem I had with my screen. I brought in both a laptop and a printer, and everything was done very efficiently, carefully and quickly. Very friendly staff and a friendly little dog, Umka.

Anna Semenets
Anna Semenets
⭐⭐⭐⭐⭐
• 4 weeks ago

Great service, they saved my work! Huge thanks to the guys for the fast, efficient repair of my printer, which jammed paper right in the middle of a busy period at work. The diagnosis was done in front of me, I was given a fair price straight away with no hidden costs, and I picked up the working printer the very next day. I definitely recommend this place for complete professionalism, express speed and lovely service!

Jola Wychowska
Jola Wychowska
⭐⭐⭐⭐⭐
• a month ago

Fast, efficient and affordable printer repair. They managed to save the print head, which means they saved my printer. Very polite people. They also helped me a lot with my car, which broke down not far from their premises. Thank you so, so much. I am immensely grateful and recommend them to everyone!!!

Adam Ziaja
Adam Ziaja
⭐⭐⭐⭐⭐
• 3 weeks ago

I recommend this printer repair shop. They work very efficiently and my inkjet printer works like new

Daniel Bacherek
Daniel Bacherek
⭐⭐⭐⭐⭐
• 7 months ago

I highly recommend this service! My HP laser printer was leaving ugly streaks on the pages and I was sure an expensive repair was ahead. Thanks to the service’s expert diagnosis, it turned out a simple toner replacement was enough. I would never have figured that out myself, and thanks to their honesty I fixed it cheaply and quickly. A big plus for professionalism and for not talking you into unnecessary costs!

Peter Mishchuk
Peter Mishchuk
⭐⭐⭐⭐⭐
• 3 months ago

Thank you for the fast and professional printer repair and for changing its language from German to Polish. I recommend this service and Mr Andrzej.

Lyhun Oleksandr
Lyhun Oleksandr
⭐⭐⭐⭐⭐
• 3 months ago

I brought my computer in for repair and I am very satisfied. Fast diagnosis, an honest approach and professional service. Everything was fixed efficiently, and I also got some useful tips for the future. Definitely recommended!

Valery S
Valery S
⭐⭐⭐⭐⭐
• 3 months ago

Amazing service! Highly recommended. Something happened to my laptop, and there were important documents and work that I had to complete. I brought my laptop in the evening, when the workshop was almost closing, but the employee Max, given the urgency of the matter, stayed and fixed everything quickly, which saved me, thank you very much! Very good work and friendly staff who will help with any problem. Thank you very much again!

Gabrysia Pawełczak
Gabrysia Pawełczak
⭐⭐⭐⭐⭐
• 2 months ago

Wonderful service and complete professionalism! They quickly diagnosed the problem with my computer and repaired it efficiently. They also helped me with my printer, which works flawlessly after the repair. Everything was explained thoroughly, the prices are fair, and the staff are very pleasant and to the point. I definitely recommend this service to anyone looking for expert help with computers and printers. I will certainly use it again